PLC and SCADA Integration
Factory controllers and control rooms connected to the business.
- 1PLC programming and upgrades
- 2SCADA and HMI screens
- 3Recipes and orders sent to the line
- 4Production data returned to the system
| Solution | PLC and SCADA Integration |
|---|---|
| Works at | Business system, Supervision, Control |
| Connects to | ERPNext production, stock and maintenance |
| Engineered by | Azzir Group |
Plants where the control room and the office do not talk.
- Floor to ledger
What the machine does appears in production, stock and cost the same minute.
- Engineered, not improvised
Designs, drawings and tests before anything is switched on.
- Kept running
Spares, maintenance and support after commissioning.
Four phases.
- Phase 1Study the line
We measure the current line: rates, stoppages, people and layout.
- Phase 2Design and simulate
Layout, equipment list, controls design and expected performance.
- Phase 3Build and commission
Installation, programming and testing against agreed targets.
- Phase 4Hand over and support
Training, documentation, spares and a maintenance agreement.
Cameras that check every unit on the line.
Food, beverage, pharmaceutical and packaging lines.Filling, sealing, labelling, packing and palletising.
Processors scaling beyond manual packing.Arms that pack, load, weld and palletise beside your team.
Small and mid-sized factories with repetitive stations.

