Lines that run
themselves.
Machines, controls and software joined into one line, and that line joined to the business system that plans and costs it.
OEE, in
one number.
Overall equipment effectiveness is availability, times performance, times quality. We measure it on your line before we promise to raise it. Move the sliders to try your own numbers.
From the sensor
to the ledger.
Every plant has the same five levels. We work at each of them, and we join the top one to your business system.
- L4Business systemERPNext: orders, stock, cost, maintenance
- L3Production managementSchedules, downtime reasons, OEE
- L2SupervisionSCADA and operator screens
- L1ControlPLCs, robot and drive controllers
- L0FieldSensors, cameras, motors and actuators
Where to start.
Most plants start with one station and grow. Each solution is engineered, documented and supported.
Counts, downtime and output from every machine, live.
Manufacturers who measure output at the end of the shift.Factory controllers and control rooms connected to the business.
Plants where the control room and the office do not talk.Cameras that check every unit on the line.
Food, beverage, pharmaceutical and packaging lines.Filling, sealing, labelling, packing and palletising.
Processors scaling beyond manual packing.Arms that pack, load, weld and palletise beside your team.
Small and mid-sized factories with repetitive stations.Conveyors, sorters and mobile robots that move the goods.
Distribution centres, e-commerce and third-party logistics.Machines that warn you before they fail.
Plants where one breakdown stops the whole line.

