Industrial automation in Kenya and Africa

Lines that run themselves.

Machines, controls and software joined into one line, and that line joined to the business system that plans and costs it.

Good0
Rejected0
Line rate60 / min
Last rejectNone
Measure first

OEE, in one number.

Overall equipment effectiveness is availability, times performance, times quality. We measure it on your line before we promise to raise it. Move the sliders to try your own numbers.

Running time as a share of planned time
Actual speed as a share of rated speed
Good units as a share of all units
66%
OEE
Planned time100%
Availability loss
Speed loss
Quality loss
Good output
The stack

From the sensor to the ledger.

Every plant has the same five levels. We work at each of them, and we join the top one to your business system.

Level 4 · Business system

The line, joined to the business.

Orders go down to the line. Output, scrap, downtime and machine hours come back up and land in production, stock and cost.

Business Systems →
Start small

Start with one station. We will study the line.